Skip to content
Esc
↑↓navigate↵open⌘Jpreview

Reiner Lemoine Institute & Goal100

Turning grid plansinto data.Open and georeferenced.

Since the end of October, Germany's larger distribution system operators have published a second round of grid expansion plans with more than 33,000 measures. The data is still hard to use. gridAhead turns those published plans into open, georeferenced datasets.

Stylized map of Germany: hexagons shaded by the density of grid expansion measures, overlaid with a schematic grid of existing and planned lines and substations.

Over 33,000 measures.Still hard to use as data.

New wind and solar plants, storage, heat pumps, and charging points can connect only as fast as the distribution grid is reinforced. The plans for that work are public. Coordinates and open licences are mostly still missing.

Second round, 2026
80 of 85 operators have published measures. About 20,000 of the more than 33,000 are ongoing or planned. Where they are is still generally unclear.
Spreadsheets, not maps
Most operators now use a common spreadsheet format. The 2024 round was PDF only. Measures still have no coordinates, and the grid maps are still images in the reports.
Every two years
Operators with 100,000 or more customers, and smaller ones with significant wind or solar curtailment, must publish a plan on VNBdigital under §§ 14d and 14e EnWG.

From published plans to open data.What gridAhead is building.

  1. 01

    Geocode planned measures

    Locate announced measures from the 2024 and 2026 plans, so it is clear where and when the grid near a site is planned to be reinforced.

  2. 02

    Georeference grid maps

    Digitize the maps in the plans and enrich them with other public data. Studies can then use real medium-voltage topologies instead of synthetic model grids.

  3. 03

    Make it accessible

    Publish results under open licences whenever possible, so others can reuse one versioned dataset instead of starting from the original documents again.

  4. 04

    Build a community

    An open community that uses, reviews, and develops the data and the methods. Help on GitHub.

Making these plans easier to use does not conflict with the protection of critical infrastructure. gridAhead works only with information distribution system operators have already published.

Cooperation

A cooperation of the Reiner Lemoine Institute and Goal100.

Read the introduction

Funded by

Goal100's initiative for gridAhead is jointly funded by Google.org and the Veolia Stiftung, and hosted by ProjectTogether.